Home > Stormwater > Water Sensitive Urban Design > Vegetated Treatment Measures
Welcome to the Clearwater InfoExchange - Stormwater resource library. Here you can access a wealth of up to date material that will assist you sustainably manage stormwater, and know the trends and facts that matter.
This constantly updated resource library currently contains 343 resources. You will find case studies, technical guidelines, training manuals, fact sheets, world leading research papers and more.
You too can lodge case studies, reports and papers to share with others in this field.
Results of your search can be re-ordered by clicking on the column headings.
To view a resource, click on the link or refine your search using the infosearch below.
Vegetated Treatment Measures contains 50 resource(s).
To browse other resources in
Water Sensitive Urban Design
select one of the subtopics listed below or use the search box above to do a keyword search.
| Title | Organisation | Type | Headline | Date Uploaded |
| Altona Green Park WSUD case study | Clearwater | Case Study |
Altona Green Park, a combined residential and recreational development, is an example of a financially successsful yet also environmentally sustainable. | 27-10-2005 |
| Altona Tip Wetland Development | Hobsons Bay City Council | Case Study |
Re-development of open water channel into series of 3 water quality improvement ponds to treat run-off prior to it entering Port Phillip Bay. | 08-10-2003 |
| Arndell Park WSUD case study | Clearwater | Case Study |
case study of numerous WSUD treatment measures employed in housing estate | 20-01-2006 |
| Avoca Riverflat Enhancement & Beaufort Stormwater Enhancement | Pyrenees Shire Council | Case Study |
Project focusing on installation of litter trap and construction of swale drain in Avoca to reduce pollutants entering waterways, increasing public awareness. | 09-10-2003 |
| Barak Bushland WSUD case study | Clearwater | Case Study |
Case Study of WSUD at Barak Bushland which protects the Diamond Creek by filtering stormwater while also providing a haven for biodiversity | 29-09-2005 |
| Blackburn Lake Stormwater Quality Improvement | Whitehorse City Council | Case Study |
Installation of litter traps on three inlets to Blackburn Lake - treatment of stormwater via chemical, biological and physical processes. | 22-10-2003 |
| Botanic Gardens Wetland - Detailed Design | Greater Bendigo City Council | Case Study |
Bendigo Botanic Gardens wetland - design and development. | 08-10-2003 |
| Burrumbeet Creek Wetland/Flow Control Basin, with Targeted Industry Education Program | Ballarat City Council | Case Study |
Wetland construction and education/enforcement program; launch of awareness program promoting purpose of gross pullutant traps and wetlands. | 07-10-2003 |
| Community Wetlands - Stage 1, Development Plans | Southern Grampians Shire Council | Case Study |
Community wetland proposal for Hamilton - long term goal of education centre for wetlands and stormwater management. | 08-10-2003 |
| Construction of Wetland & Installation of Side Entry Pit Baskets and Gross Pollutant Traps | Moira Shire Council | Case Study |
Investigation of options for stormwater reuse for agricultural purposes, installation of side entry pit baskets, feasibility study for wetland construction on Murray River Floodplain, Installation of gross pollutant traps in Cobram and Yarrawonga. | 09-10-2003 |
| Corral Car Park Stormwater Treatment Train | Mount Hotham Alpine Resort Management Board | Case Study |
Treatment train including: sediment detention swales, energy dispersion units, vegetative filter strips, surfacing car park edge and entry. | 09-10-2003 |
| Cremorne Street Urban Design and Construction | Yarra City Council | Case Study |
South Richmond streetscape design project. | 08-10-2003 |
| Dandenong Creek Wetlands and Education Centre | Greater Dandenong City Council | Case Study |
Development of litter trap and wetlands near Stud Road, installation of interpretive signage. Increase public awareness of stormwater issues and provide opportunity to develop a learning centre for schools. | 09-10-2003 |
| Demonstration Project on Use of Bio Retention Trench (Water Sensitive Urban Design Principles) in Unsewered Areas | Cardinia Shire Council | Case Study |
Trial use of bio retention trenches to improve water quality. | 08-10-2003 |
| Designing and Implementing Urban Stormwater Treatment in Halls Gap Prior to it Entering Fyans Creek | Northern Grampians Shire Council | Case Study |
Treat unmade road and residential land runoff before it reaches Fyans Creek (Halls Gap). | 09-10-2003 |
| Designing and Implementing Urban Stormwater Treatment in Murtoa | Yarriambiack Shire Council | Case Study |
Implement treatment train addressing industrial land use in Murtoa. | 09-10-2003 |
| Designing and Implementing Urban Stormwater Treatment Prior to it Entering the River in Dimboola | Hindmarsh Shire Council | Case Study |
Implementation of an urban stormwater treatment train to address effect of runoff from unsealed roads into the Wimmera River. | 09-10-2003 |
| Development of Challenge Street Wetlands | Nillumbik Shire Council | Case Study |
Development of wetland to treat stormwater runoff from surrounding residential development. | 09-10-2003 |
| East Gippsland Stormwater Quality Improvement Program | East Gippsland Shire Council | Case Study |
Key stormwater treatment infrastructure: gross pollutant traps, litter screening devices, nutrient stripping wetlands, sedimentation basins, and drainage line rehabilitation. | 09-10-2003 |
| Edwardes Lake, Our Lake Neighbourhood Environment Improvement Plan (NEIP) | Darebin City Council | Case Study |
The NEIP aims to lessen negative stormwater impacts, improve water quality and engage the community in the task of creating a more sustainable Edwardes Lake
|
07-10-2003 |
| Grange Burn WaterCare and Community Wetland Project | Southern Grampians Shire Council | Case Study |
Minimising amount and range of pollution entering Grange Burn and Lake Hamilton - development of management actions and incentives (community consultation), raise community awareness of link between litter traps, wetlands, and reducing pollution. | 09-10-2003 |
| Help Drain Main Save Thunderberg! | Stormwater.org.au | Demonstration |
Interactive Stormwater Pollution Game
|
19-03-2008 |
| Implementing Urban Stormwater Treatment in Horsham Prior to it Entering the Wimmera River | Horsham Rural City Council | Case Study |
Construction of wetland in Horsham South catchment area. | 09-10-2003 |
| Improving Water Quality in the Dabyminga Creek & Goulburn Broken Catchment | Mitchell Shire Council | Case Study |
Wetland construction: grey water and stormwater go through litter trap, sediment pond and constructed wetland to reduce gross pollutants entering Goulburn Broken Catchment. | 09-10-2003 |
| Industrial Runoff Mitigation - Upper Maribyrnong River | Melbourne City Council | Case Study |
Industrial runoff into Upper Maribyrnong River - development of inventory of key polluters, consultation, design for rehabilitation of existing wetland system. | 22-10-2003 |
| Inkerman Oasis Development WSUD case study | Clearwater | Case Study |
Stormwater and greywater capture, treatment and reuse in a social housing development | 10-11-2005 |
| Integrated Water Sensitive Urban Design Benchmarking and Local Guidebook Development | Ballarat City Council | Case Study |
A guidebook which details appropriate Water Sensitive Urban Design techniques for the Ballarat region and examines the implementation of these in the Canadian Lakes Estate development | 08-10-2003 |
| Kialla Lakes - Integrated Stormwater Management and Demonstration Project | Greater Shepparton City Council | Case Study Demonstration |
Construction of wetlands, promotion of water sensitive urban design principles into future residential developments, and implementation of a sediment control pilot project for building and development projects. | 07-10-2003 |
| Les Stone Park Wetland | Wodonga Rural City Council | Case Study |
Community education via signage, brochures, newsletters, local press releases, construction of wetland for environmental education for schools, training of council staff, and contractors. | 09-10-2003 |
| Narr Maen Reserve Stormwater Treatment Wetland Stage 1 | Maroondah City Council | Case Study |
Creation of stormwater treatment wetland, improve wildlife habitat and recreational amenity, involvement of local community in tree planting and ongoing maintenance, interpretive signage around wetland, education of community on litter control. | 09-10-2003 |
| Nurmurkah Stormwater Treatment - Broken Creek | Moira Shire Council | Case Study |
Reducing nutrient loads and sediments leading to improved creek health. Development of a unique riverine environment. | 07-10-2003 |
| OT Flight Reserve and Malvern Valley Public Golf Course Wetland Feasibility Studies | Stonnington City Council | Case Study |
Feasibility studies for location of two wetlands, community and stakeholder consultation. | 09-10-2003 |
| Parker Street and surrounds WSUD case study | Clearwater | Case Study |
Case study of a road reconstruction incorporating WSUD to improve drainage and amenity. | 29-09-2005 |
| Reducing Stormwater Impacts in the Gannawarra Shire | Gannawarra Shire Council | Case Study |
Integrated approach to stormwater management, including source control and treatment options. | 08-10-2003 |
| Review of Street Scale WSUD in Melbourne | City of Kingston and Better Bays and Waterways | Report Research |
First report reviewing retrofitted WSUD sites in Melbourne.
|
20-03-2007 |
| Riviera Street WSUD case study | Clearwater | Case Study |
Vegetated inlet zones and filter beds incorporated into the road resurfacing of Riviera Street in Cheltenham | 27-10-2005 |
| Roger Street Drain Wetlands - Kyabram | Campaspe Shire Council | Case Study |
Addressing problems associated with urban stormwater discharging untreated to Wyuna Drain and impacts on surrounding catchments. | 07-10-2003 |
| Rowville Community Centre Re-Development Project | Knox City Council | Case Study Demonstration |
Incorporating Ecologically Sensitive Design principles into the existing re-development of the Rowville Community Centre. | 09-10-2003 |
| Rushworth West Catchment Outfall Treatment Train | Campaspe Shire Council | Case Study |
Treatment train consisting of gross pollutant traps, a detention basin and a vegetated swale. | 07-10-2003 |
| Silt/Litter Traps, Bendigo Creek, Epsom | Greater Bendigo City Council | Case Study |
Survey, design and construction of a natural silt/litter trap. | 07-10-2003 |
| Stormwater Gross Pollutants | Cooperative Research Centre for Catchment Hydrology | Report Research |
Stormwater Gross Pollutants Report | 22-10-2003 |
| Sumison Gardens Wetlands | Wodonga Rural City Council | Case Study |
Design and construction of water quality treatment ponds and wetlands - Wodonga Waterways study. | 08-10-2003 |
| Urban Stormwater Improvements Cobden Lake | Corangamite Shire Council | Case Study |
Community education, litter surveys, drain stencilling, sedimentation ponds, net tech litter nets, vegetated swales, removal of exotic weed species. | 09-10-2003 |
| Valley Reserve Wetland | Monash City Council | Case Study |
Installation of wetland and gross pollutant trap. | 07-10-2003 |
| Water Sensitive Urban Design Road Reconstruction | Kingston City Council | Case Study |
New benchmarks for improving stormwater treatment in reconstruction of existing urban roads. Model for improving community awareness and understanding, community participation in stormwater quality treatment measures. | 22-10-2003 |
| Wells Road WSUD case study | Clearwater | Case Study |
case study of WSUD to treat stormwater runoff from main road | 20-01-2006 |
| Winter Creek Wetland/Flow Control Basin with Developer Best Practice Forums | Ballarat City Council | Case Study |
Investigation of non-structural and structural measures for stormwater management. | 07-10-2003 |
| WSUD in Metropolitan Melbourne | Clearwater | Report Research |
This report details the results of research conducted for Clearwater into WSUD case studies in Metropolitan Melbourne | 20-01-2006 |
| Wyndham Waters WSUD case study | Clearwater | Case Study |
Case study of WSUD in Wyndham Waters housing estate | 20-01-2006 |
| Yarrowee - Redan Wetlands | Ballarat City Council | Case Study |
New wetland system on the floodplain of Yarrowee River and Redan Creek to improve stormwater quality. | 07-10-2003 |
